Completed

The projects under different development programmes completed by the department are listed below:

  • Construction of Agricultural Engineering Offices and Workshop at Toba Tek Singh
  • Optimization and Standardization of Operational Parameters of Hot Water Treatment (HWT) System to Control Post Harvest Diseases and Insects of Mangoes
  • Evaluation of phosphoric acid (52% P2O5) as an alternative to commercial phosphate fertilizers and enhancing its efficiency for higher crop productivity
  • Promotion of Biogas Supplemented Tubewells For Irrigation Purposes in Punjab (A Pilot Project)
  • Adaptation of Biogas Technology to Mitigate Energy Crises
  • Maintenance Management System of Stores for Bulldozers & Other Equipment of Field Wing
  • Wheat Straw Management in Wheat Growing Areas of Punjab
  • Establishment of Water Recharge System through Construction of Mini Dams in Valley Soon Sakesar and Mohar Area of Khushab (Phase-II)
  • Promotion of Mechanized Multi-crop Farming in Mixed Cropping Zone of the Punjab
  • Farm Mechanization for Food Security
  • Green Tractor Scheme
  • Cotton Sticks Management in Cotton Areas of Punjab
  • Rehabilitation / Rebuilding of Komatsu bulldozers
  • Procurement of Bulldozer Transporter to Strengthening Transportation Facilities
  • Construction of Residences for Officers / Officials of Agricultural Engineering Talaganag District Chakwal
  • Establishment of Water Recharge System through Construction of Mini Dams in Soon Valley and Mohar Areas of District Khushab (Phase-I)
  • Strengthening of Well Drilling Services through Procurement of Machinery & Equipment
  • Research, Introduction of New Farm Mechanization Technologies in Punjab
  • Exploration of Groundwater in the Punjab
  • Provision of Subsidy on Installation of Tubewell in D.G.Khan District
  • Research & Introduction of Mechanized Cotton Picking in Punjab
  • Provision of Assured Water Supply for Increased Agriculture Production through Installation of Turbine Tubewells in Barani Areas of Rajanpur District
  • Land Resource Development for the Uplift of Farming Community
  • Bulk Provision of Sare Parts for Repair of Crawler Tractors to Improve Efficiency of Land Development Operations
  • Water Resource Development through Installation of Diesel Tubewells in Canal Commanded and Saliaba Areas of Punjab at Subsidy Cost
  • 2nd Barani Area Development Project (Soil & Water Conservation Component)
  • Installation of Tubewell in Mohar & Soan Valley Areas of District Khushab
  • Establishment of Industrial Research & Extension Division in AMRI, Multan
  • Installation of Turbine Tubewells in Barani Areas of District Sialkot
  • Procurement of Power Drilling Rigs
  • Procurement / Replacement of Crawler Tractor
  • Hydra Drill Research Sargodha
  • Strengthening of AMRI, Multan
  • Procurement of Crawler Tractors
  • Provision of Stipend to The Trainees of Agricultural Machinery Training Schools
  • 1st Barani Area Development Project (Soil & Water Conservation Component)
  • Lift Irrigation Scheme in the Punjab
  • Subsidy of Sinking of Private Diesel Tubewells in Punjab (State Subsidy Scheme)
  • Replacement of Existing Fleet of Crawler Tractors